We build it in card and timber first, so every floor is solved before the first truck arrives.
Excavation, piling and a raft slab poured in one continuous day.
Self-climbing formwork and our own crane crews keep the core moving in any weather.
Glass, bronze and lights on, the week the contract said.
From the top of our crane, the city we have been building for 31 years.

Architects, engineers and our estimators around one physical model.
Weeks 1–8One fixed tender, every line itemised. No provisional sums.
Weeks 6–14Excavation, piles and the raft slab, poured in a single day.
Months 4–6A floor a week with self-climbing formwork.
Months 6–14Glass, bronze fins, services and interiors floor by floor.
Months 12–20Snagging done before the keys, with a 10 year structural warranty.
Month 22Thirty-one years of concrete, steel and handovers that happened on the date in the contract.





Towers, headquarters, hillside homes and seafront hotels, built by our own crews from the ground up.

Handed over 2026

Handed over 2025

Handed over 2024

Under construction